Science & Technology Space Technology GS Paper III

Space Technology — Quick Revision

One-page UPSC revision of space technology: ISRO launch vehicles, orbit types, satellite systems, key missions with dates, Gaganyaan and space-sector reform.

SyllabusGS III · Awareness in the fields of IT, space, computers, robotics, nano-technology, bio-technology and IPR

By 3 min read Updated Oct 2026 #quick revision#science-technology#space-technology

A last-week revision sheet for space. Most Prelims questions here are matching questions — mission to vehicle, orbit to purpose, body to function.

Launch Vehicles at a Glance

VehicleStagesCryogenic stage?Known for
SLV-34 solidNoRohini RS-1, 18 July 1980
ASLV5 solidNoExperimental, early 1990s
PSLVSolid–liquid–solid–liquidNoChandrayaan-1, Mangalyaan, Aditya-L1; 104 satellites (2017)
GSLV Mk II3 stagesYes (indigenous since GSLV-D5, January 2014)GSAT and NVS navigation satellites
LVM3S200 boosters, L110 core, C25 upperYesChandrayaan-2, Chandrayaan-3, OneWeb batches; Gaganyaan
SSLV3 solid + liquid trimming moduleNoSmall satellites; success in 2023 and 2024

Orbits

OrbitKey fact
LEOUp to about 2,000 km; space stations, imaging
Sun-synchronousNear-polar; same local solar time on every pass
MEOGlobal navigation (GPS)
GeosynchronousAbout 35,786 km; period of one sidereal day
GeostationaryGeosynchronous + equatorial + zero inclination; fixed in the sky
GTOElliptical transfer orbit to reach GEO
L1About 1.5 million km sunward; Aditya-L1

Missions and Dates

MissionLaunchVehicleRemember
AryabhataApril 1975Soviet rocketFirst Indian satellite
Chandrayaan-1October 2008PSLV-C11Moon Impact Probe; water molecules
Mars Orbiter MissionNovember 2013PSLV-C25Mars orbit September 2014, first attempt
AstroSatSeptember 2015PSLVFirst Indian space observatory
Chandrayaan-2July 2019GSLV Mk IIIOrbiter working; lander lost
Chandrayaan-3July 2023LVM3Landed 23 August 2023 near south pole
Aditya-L1September 2023PSLV-C57Halo orbit at L1, January 2024
XPoSatJanuary 2024PSLV-C58X-ray polarimetry
SpaDeXDecember 2024PSLV-C60Docking achieved January 2025
NISARJuly 2025GSLV-F16NASA–ISRO radar imaging satellite
High-yield facts
  • Chandrayaan-3 made India the fourth country to soft-land on the Moon and the first near the south pole.
  • SpaDeX made India the fourth country to dock spacecraft in orbit.
  • NavIC: seven satellites, regional (India + about 1,500 km); NVS series adds the L1 band.
  • Gaganyaan crew-escape test: TV-D1, 21 October 2023.
  • Targets announced: Bharatiya Antariksh Station by 2035, Indian on the Moon by 2040.

Institutions

BodyYearRole
INCOSPAR1962Precursor of ISRO, under Vikram Sarabhai
ISRO1969Research, development, missions
Department of Space / Space Commission1972Policy and administration
NSIL2019Commercial arm of the Department of Space
IN-SPACe2020Authorises and promotes non-government space activity
Indian Space Policy2023End-to-end private participation

FDI (February 2024): 74% automatic (satellite manufacturing and operation) · 49% automatic (launch vehicles, spaceports) · 100% automatic (components and systems).

Traps

Watch these
  • PSLV has no cryogenic stage.
  • Geosynchronous is not always geostationary.
  • India was the first Asian country to reach Mars orbit — not the first country.
  • Aditya-L1 observes the Sun from L1; it does not orbit the Sun’s surface region.
Advertisement