A last-week revision sheet for EIA. Prelims targets who does what at which stage; Mains targets why the process falls short.

Framework

ItemKey fact
PurposePredict and mitigate impacts before a decision
Rio DeclarationPrinciple 17 — EIA as a national instrument
First EIA lawNEPA, USA, 1969
Parent law in IndiaEnvironment (Protection) Act, 1986
First notification27 January 1994
Current notification14 September 2006
Single windowPARIVESH (2018)
ConsultantsAccredited through QCI–NABET; paid by proponent

Categories

CategoryAppraisalClearance
AExpert Appraisal Committee (Centre)MoEFCC
B1SEAC (EIA report needed)SEIAA
B2SEAC (no EIA report)SEIAA

Category B within 10 km of protected areas, critically polluted areas, eco-sensitive areas, or inter-State/international boundaries → treated as Category A.

Stages

StageKey point
ScreeningOnly Category B; B1 or B2
ScopingTerms of Reference
Public consultationHearing by SPCB/UTPCC; DM or ADM presides; 30 days’ notice; written responses
AppraisalEAC/SEAC recommends; regulator decides
MonitoringSix-monthly compliance reports
ClearanceLaw
ForestVan (Sanrakshan Evam Samvardhan) Adhiniyam, 1980
WildlifeWildlife (Protection) Act, 1972 — NBWL Standing Committee
CoastalCRZ Notification, 2019 (under EP Act)

CRZ 2019

ZoneCoversRule
IMangroves, corals, dunes, intertidalMost restricted
IIDeveloped urban shorelineBuild landward of existing structures
III ARural, density ≥2,161/sq km (Census 2011)50 m NDZ from HTL
III BOther rural200 m NDZ from HTL
IVWater area to 12 nautical miles; tidal water bodiesWater-based activities regulated

Judgments

CaseHolding
Lafarge (2011)Guidelines; national regulator suggested
Common Cause (2017)Mining without clearances — compensation equal to value of illegally extracted mineral
Alembic (2020)Ex post facto clearance contrary to environmental jurisprudence
High-yield facts
  • The EIA and CRZ notifications are delegated legislation under the EP Act, 1986 — not separate Acts.
  • SEA assesses policies, plans and programmes; EIA assesses projects.
  • Espoo Convention (1991): transboundary EIA; Kiev Protocol (2003): SEA.
  • Draft EIA Notification, 2020 proposed post-facto clearance; it drew wide public comment.
Traps
  • Screening is not for Category A.
  • The SPCB, not the proponent, conducts the public hearing.
  • CRZ-IV is water, not land.