Environment & Ecology Environmental Impact Assessment UPSC Practice Questions

Environmental Impact Assessment — Practice Questions

UPSC Prelims-pattern practice questions on EIA with explanations: public hearings, Category A and B projects, strategic environmental assessment, chronology and CRZ.

5 Questions Updated Oct 2026 #upsc#practice-questions#environment

Questions

These are original UPSC-pattern practice questions. Attempt each one before revealing the answer.

UPSC Practice · Prelims GS I Qeiap-1

With reference to public hearings under the EIA Notification, 2006, consider the following statements:

  1. The public hearing is conducted by the State Pollution Control Board or the Union Territory Pollution Control Committee.
  2. It is presided over by the District Magistrate or a representative not below the rank of Additional District Magistrate.
  3. All Category B2 projects must hold a public hearing.

Which of the statements given above is/are correct?

  1. A 1 and 2 only
  2. B 2 only
  3. C 1 and 3 only
  4. D 1, 2 and 3
Solution

Statements 1 and 2 are correct. Statement 3 is incorrect — Category B2 projects require neither an EIA report nor public consultation.

Answer: A

UPSC-pattern practice question
UPSC Practice · Prelims GS I Qeiap-2

Under the EIA Notification, 2006, a Category B project located within 10 km of a notified protected area is generally:

  1. A exempted from environmental clearance
  2. B appraised as a Category A project at the central level
  3. C appraised by the District Collector
  4. D required to obtain only a forest clearance
Solution

Under the notification’s General Condition, a Category B project located wholly or partly within 10 km of protected areas, critically polluted areas, notified eco-sensitive areas, or inter-State and international boundaries is treated as Category A and appraised at the Centre. It is not exempted; the District Collector does not appraise projects; and forest clearance is a separate requirement, not a substitute.

Answer: B

UPSC-pattern practice question
UPSC Practice · Prelims GS I Qeiap-3

Strategic Environmental Assessment (SEA) differs from project-level EIA mainly because SEA is applied to:

  1. A individual projects after their construction
  2. B post-clearance compliance monitoring only
  3. C policies, plans and programmes
  4. D projects located in coastal zones only
Solution

SEA evaluates the environmental consequences of policies, plans and programmes before individual projects are selected, so broader alternatives and cumulative effects can be weighed. It is not a post-construction review, not limited to compliance monitoring, and not confined to coastal projects.

Answer: C

UPSC-pattern practice question
UPSC Practice · Prelims GS I Qeiap-4

Arrange the following in chronological order:

  1. National Environmental Policy Act of the United States
  2. India’s first EIA Notification under the Environment (Protection) Act
  3. Espoo Convention on EIA in a transboundary context
  4. India’s EIA Notification, 2006

Select the correct answer using the code given below.

  1. A 1-2-3-4
  2. B 3-1-2-4
  3. C 1-3-4-2
  4. D 1-3-2-4
Solution

NEPA — 1969; Espoo Convention — 1991; India’s first EIA Notification — January 1994; EIA Notification — September 2006. Order: 1-3-2-4.

Answer: D

UPSC-pattern practice question
UPSC Practice · Prelims GS I Qeiap-5

Consider the following statements regarding the Coastal Regulation Zone Notification, 2019:

  1. In CRZ-III A areas, the No Development Zone extends 50 metres from the High Tide Line.
  2. CRZ notifications are issued under the Environment (Protection) Act, 1986.

Which of the statements given above is/are correct?

  1. A 1 only
  2. B 2 only
  3. C Both 1 and 2
  4. D Neither 1 nor 2
Solution

Both are correct. CRZ-III A (densely populated rural areas) has a 50 m No Development Zone; CRZ-III B has 200 m. CRZ notifications are delegated legislation under the Environment (Protection) Act, 1986, like the EIA Notification.

Answer: C

UPSC-pattern practice question
UPSC Practice · Mains GS III 10 marks · 150 words Qeiap-m1

Why is cumulative impact assessment important for regions such as the Himalaya? Discuss with reference to the limitations of project-by-project EIA.

Solution

Introduction: Project-level EIA examines one dam, road or tunnel at a time. In fragile, seismically active regions such as the Himalaya, many such projects together can change slope stability, river flow and ecosystems in ways no single EIA captures.

Body:

  • Limitations of project-by-project EIA:
    • Ignores combined effects of several hydropower projects on one river — loss of free-flowing stretches, sediment trapping, effects on aquatic life.
    • Underestimates disaster risk from cumulative slope cutting, blasting and muck disposal.
    • Baseline studies are often short and local; climate-driven hazards such as glacial lake outburst floods are poorly assessed.
    • Splitting large projects into smaller units can keep each below thresholds.
  • Value of cumulative impact assessment:
    • Basin- and region-level view of carrying capacity.
    • Identifies which stretches must stay free of projects.
    • Supports strategic environmental assessment of sector plans.
    • Improves disaster preparedness and long-term economic viability of projects.
  • Way forward: mandatory basin-level studies before project clearances; carrying-capacity studies for hill towns; independent appraisal; integration with disaster management planning.

Conclusion: In fragile landscapes, the whole is riskier than the sum of its parts; cumulative and strategic assessment must precede individual clearances.

UPSC-pattern practice question